Does Woodhaven want a community center—and what should happen to the former golf course?

Before discussing a location or building size, residents should decide whether Woodhaven wants a community center at all—and whether it should take priority over other neighborhood needs. The land beside East Regional Library was considered only as a possible playground and outdoor-amenity site; it was never proposed as a community-center location. If residents support a center, the former country-club campus and other feasible sites can then be compared.

This is a planning survey, not a petition or endorsement. It begins by asking whether a community center is wanted before asking conditional questions about size, location and amenities.

Start with the community

First decide whether Woodhaven wants a community center.

A community center should not be treated as a settled neighborhood priority. Residents should be able to say yes, no, unsure or that more information is needed—and should be able to weigh a center against streets, drainage, parks, public safety, housing conditions and other needs. Separately, the land beside East Regional Library was considered only as a possible playground and outdoor-amenity site.

Library parcel

Playground concept only

This parcel was never considered as a location for the community center. The concept was limited to possible inclusive play equipment, shade, seating, trees, a small pavilion, safer walking access and connections to the library.

Community preference

Need and priority are not yet established

If residents support a center, the City should then define the desired services, operating model, cost and feasible sites. If residents do not support one, public funds should be directed to higher priorities.

If residents support a center

Compare the former clubhouse campus with other feasible sites.

Location should be considered only after the community-center question is answered. The City should then compare feasible sites using the same standards: access, drainage, flood risk, land cost, utilities, environmental conditions, neighborhood impact, operating practicality and room to grow.

Comparison site02

Another pad on the former course

A nearby higher or more accessible portion of the property may work better than placing the building directly over the old clubhouse.

  • May offer better drainage or construction conditions
  • Could improve access from a collector street
  • Could preserve the best parts of the old campus for outdoor use
Alternative03

Another central Woodhaven site

The City should compare any realistically available public or partnership site before committing to the golf-course property.

  • Public control and guaranteed resident access
  • Enough acreage for parking and expansion
  • Safe walking, transit and vehicle access
  • Lower total acquisition and construction cost
Important distinction: The library parcel is not part of this location comparison; it was considered only for a playground and outdoor amenities. If a center is supported, “at the old clubhouse” should mean the broader former country-club campus until professional site studies identify the safest and most practical building pad.

If a center is supported

What level of service—if any—should the City study?

Size and amenities should not be selected until residents have first indicated whether they want a center. Those who do should be able to compare a small meeting facility, a phased center and a full-service building; those who do not should be able to direct resources elsewhere.

10,000–15,000 sq. ft.

Small

Primarily meeting rooms, classes, offices and limited fitness space.

Best for: A neighborhood meeting and activity building.
Tradeoff: Little or no full gymnasium and fewer simultaneous programs.
18,000–24,000 sq. ft.

Medium

Multipurpose recreation, fitness and community programming with careful space sharing.

Best for: A practical first phase where land and funding are constrained.
Tradeoff: Some amenities may remain undersized or scheduled tightly.

For scale, Fort Worth’s Diamond Hill project is planned at approximately 25,000 square feet and the Stop Six Hub/MLK center at approximately 28,000 square feet. These examples help residents visualize service levels; they do not establish Woodhaven’s final size.

What could it include?

Prioritize flexible spaces used throughout the day.

Recreation

Divisible gymnasium, fitness center, group exercise, pickleball and basketball.

Community

Large divisible meeting room, event space, teaching kitchen and outdoor pavilion.

Youth & learning

After-school space, tutoring, computers, teen activities and summer programs.

Seniors & access

Dedicated senior room, wellness programming, family restrooms and accessible equipment.

Resident services

Private rooms for visiting health, employment, benefits, legal and nonprofit services.

Outdoor life

Shaded playground, walking loop, event lawn, trees, trails and stormwater landscaping.

The larger land question

What should happen to the remainder of the golf course?

The community-center decision should not be used to quietly decide the future of the surrounding property. Residents should be asked directly whether they prefer development, public parkland, natural open space or a carefully defined combination.

A

Primarily developed

Most of the remaining land is developed, subject to drainage, infrastructure and compatibility requirements.

B

Development plus substantial parkland

Concentrate compatible development on appropriate land while permanently preserving a meaningful public park and trail system.

D

Natural open-space network

Focus on floodplain, habitat, mature trees, low-impact trails and greenway connections rather than intensive recreation.

Connection question

Should a public park on the former course connect to Quanah Parker Park and Gateway Park?

The survey asks whether residents support trails, greenways and safer pedestrian or bicycle connections. A connection concept would still require land, route, floodplain, safety and feasibility analysis.

Public funding

Could TIF 13 help pay for it?

Potentially—but not automatically. Some capital costs may qualify if they are lawful public improvements and are authorized through the TIF 13 Project and Financing Plan, Chapter 311, City policy, TIF Board action, City Council action and legal review.

TIF funding should not be described as a complete operating plan. Staffing, programming, utilities, maintenance and long-term replacement costs require dependable ongoing funding.

Resident input

Woodhaven Community Priorities, Community Center & Former Golf Course Survey

This survey is advisory. It begins by asking whether Woodhaven wants a community center and allows respondents to say no, unsure or that more information is needed. The library parcel is addressed only as a possible playground and outdoor-amenity site, not as a center location. The survey does not constitute a vote, petition, development approval or official Woodhaven Unites position. Verified results will be updated and published on this site, with methodology and participant categories disclosed. Published response data will be anonymous and available to the City and other interested parties.

About 7 minutesOne response per verified participant

1 About you

Contact information is used privately to verify the response and control duplicates. Do not enter an apartment number or full home address.

2 Need first, then size and location

Do you believe the Woodhaven area needs a community center?

If Woodhaven wants a center, what scale should the City study?

If Woodhaven wants a center, which locations should the City study?

3 Amenities

Which amenities are most important? Select up to five.

0 of 5 selected

4 Future of the former golf course

What should happen to the remainder of the former golf course?

Would you support public trail or greenway connections from the former golf course toward Quanah Parker Park and Gateway Park?

Which uses would you support on the former golf-course property? Select all that apply.

5 Concerns and public funding

How concerned are you about these issues?

If legally eligible and publicly approved, which TIF 13 capital uses would you support? Select all that apply.

6 Final comments
Maximum 4,000 characters.

Verification information will remain private. Updated aggregate results and anonymous response data will be published on this site and made available to the City and other interested parties.

Public reporting

Survey results and anonymous data will be published here.

Results will be updated as responses are verified and reviewed. The goal is to let residents, the City and other interested parties examine the same information rather than relying on a single headline number.

Current status

Survey open; results not yet published

Initial results will be posted after a meaningful number of responses has been received and duplicate review has begun. Later updates will identify the date of the data release and the number of verified responses included.

What will be published

  • Totals and percentages for every survey question
  • Results separated by disclosed participant category
  • Open and close dates, methodology and material limitations
  • An anonymous, downloadable response dataset suitable for independent review

What will remain private

  • Names, email addresses and telephone numbers
  • Full addresses, apartment numbers and verification records
  • Identifying details in comments that require redaction

Equal access to the record: The published summary and anonymous data will be available on this site for residents, City staff, public officials, journalists, researchers, developers and other interested parties.

Survey safeguards

Input should inform the decision—not manufacture consensus.

Duplicate control

Use private verification information and review repeated submissions before publishing totals.

Stakeholder categories

Report renters, resident homeowners, nonresident owners, businesses and other participants separately.

Full results and reusable data

Publish every question, response totals, methodology, open and close dates and material limitations. Update the results on this site and provide anonymous response data to the City and other interested parties.

No predetermined result

Do not describe the survey as a vote, petition or “community-approved plan.”